Chatsworth Solar
Development
Project

a proposed 17.81 MWdc solar energy generation facility in the Township of Chatsworth.

Project Overview

The Chatsworth Solar Project’s proposed design capacity is 17.81MWdc and located in the Municipality of Chatsworth, Grey County. The municipal address 317098 Highway 6 & 10, Chatsworth. Chatsworth received its Municipal Support Resolution from The Township of Chatsworth to submit a proposal for IESO LT2(e-1) RFP.

As part of Sitka’s sustainability efforts, we will look for opportunities to introduce agrivoltaics onto the site which is likely to include sheep grazing and beehive hosting.

Project Benefits

  • Provide annual tax revenue to local and provincial governments over the life of the Project.
  • Provides community benefits revenue to local government and First Nation land the Project is located on.
  • Create local employment and contracting opportunities during the development, construction, operation, and decommissioning phases of the Project.
  • Increase revenue to local businesses due to economic spinoff from Project activities.
  • Produce emission-free electricity that will both increase energy security and displace generation from fossil fuels, thereby reducing greenhouse gas emissions.
Location

Chatsworth, ON

Size

80 acres

Zoning

Rural

Capacity

17.81 MWdc

Connection

Interconnection to 44kV feeder adjacent to site

Land

Some sloping and undulation, a natural environment adjacent to northern edge

Public Open House

Please join us as we provide an overview of the Project, share the results of technical assessments undertaken, and, most importantly, answer any questions you may have.

Date:

July 23, 2025
6 PM - 8 PM

Location:

Chatsworth Legion,
339 Garafraxa St, Chatsworth, ON

Food and Refreshments Provided.

Location

The Municipality of Chatsworth, Grey County legally described as on Con 1 PT DIV 1 to 3 LOT 2. The municipal address of 145 Boundary Road, Chatsworth, Ontario.

CURTIS SOLARFARM_FIXED TILT_SITE PLAN

Timeline / Key Activities

  • Q4 2024 - Q2 2025

    Project Identification

    • Land Lease
    • Interconnection assessment
    • Technical due diligence
    • Environmental impact assessment
  • Q2 2025 - Q4 2025

    Stakeholder Engagement

    • Current Phase for Sitka
    • Consultation with municipality and neighbours’
    • Indigenous Community Consultation
  • Q2 2025 - Q3 2025

    Permitting

    • IESO LT2 Submission
    • Municipal Support Letter
    • Confirm Local Indigenous Support
  • Q2 2026

    IESO Procurement

    • IESO contract award
Current focus is on preparing the projects in advance of a
potential award in April 2026

Anticipated Long term timeline

  • 2024

    Land Lease

    • Permitting Review

    • Municipal Support

    • Interconnection assessment

  • 2025 - 2026

    IESO Procurement

    • Proven process ensures a smooth process

  • 2025 - 2026

    Engineering, Design & Approvals

    • IESO contract award

    • Municipal Permitting Approvals

    • Design & Construction

  • 2026 - 2028

    Construction

    • Solar array is installed

    • Project connected to existing distribution lines

     

  • 2029 - 2049+

    Commercial Operations

    • Remote monitoring

    • Annual Maintenance

  • 2051+

    Decomissioning

    • Equipment is removed

    • Land fully remediated

    • Opportunity for re-commissioning

Development Team

sitkalogo
Sitka Power - Developer, owner & operator

Sitka is led by an experienced management team, who are qualified, responsible developers, owners and operators of solar, wind, run-of river hydro, and battery energy storage assets. Sitka is backed by a dedicated private infrastructure fund.​

Sikta owns and operates 6 solar, 1 wind, and 1 battery project in Ontario, 1 solar project in Saskatchewan, 3 run-of-river hydro projects and 1 regulated utility system in British Columbia.

GOOD ENERGY PARTNERS – DEVELOPMENT PARTNER

Good Energy Partners is a renewable energy developer specializing in agrivoltaics – the dual use of land for agriculture and solar electricity generation. Local to Ontario, Good Energy is led by a credible, experienced, and innovative leadership team with 50 years of collective experience in solar, wind, and battery energy storage assets.

Working with farmland owners, grazing operations, and agricultural associations, Good Energy aims to harmonize renewable energy with the land it operates on; improving biodiversity, water retention and additional farm revenues.

What is Agrivoltaics?

Definition

Dual use of land for agriculture and solar photovoltaic (PV) electricity generation.

Objective

Generate renewable energy while enhancing agricultural productivity.

Configuration Types

On Farm Benefits

  • Natural vegetation control
  • Improved water retention
  • Increased biodiversity and soil health
  • Reliable revenue for farms
  • Greater Community Acceptance

COntact Information

Cory st. croix

Project downloads

Suite 1050, 639 5th Ave SW
Calgary, AB T2P 0M9

866-GO-SITKA | 866-467-4852
info@sitka-power.ca

Sitka Power respectfully acknowledges and pays tribute to the traditional territories of the peoples of Treaty 7, which include the Blackfoot Confederacy (comprised of the Siksika, the Piikani, and the Kainai First Nations), the Tsuut’ina First Nation, and the Stoney Nakoda (including Chiniki, Bearspaw, and Goodstoney First Nations), and to the Métis Nation of Alberta (Districts 5 and 6), on which our offices are located.